px919557 |
Posted: Thu 7:38, 06 Jan 2011 Post subject: tory burch boots Gezhouba Power Plant installation |
|
Gezhouba Power Plant installation of unit export safe and economic operation of circuit breakers
Converters, open, stop unit once, can be reduced by 4 times the switching operation of power plants, from 3F year's statistics show that power plants can reduce the number of action items for the 1040 (4F, 5F half), 3 All 6 units installed after GCB, about the year 3120 to reduce operating, greatly reducing the switching operation to run duty of labor intensity. 4.2 to further shorten the processing time of the accident Daichang 3 to 6 units of electricity due to protection malfunction or system failure tripping cutting machine, the protection only to jump in electrical power plants and export GCB switch outside the factory equipment is still running, so will reduce power plant operating personnel recovery (motor drive unit often due to loss of pressure or tachycardia causes shutdown), and the time outside the factory equipment, operating personnel in the unit within the shortest possible time recovery and network operation,tory burch boots, while processing the accident also reduced staff tension. To deal with an accident as an example: GCB is not installed, such as the above accidents, equipment inspection operations outside the plant to be 2, check the operation of power plants to be 2, check the operation to be 2 units,uggs boots italia, recovery and auxiliary power plant about external device takes about 15rain. After the installation of GCB, because regardless of outside plant equipment,Moncler prezzi, auxiliary power and the restoration crew in advance 15rain and network, can be prone 2,062,006 hydropower plant automation on September 4 Section 109 of total electricity 31250kwh, 0.2 Yuan / kWh basis, one operation can have a direct economic benefit 06,abercrombie outlet,250 yuan. Unit personnel also check the operation for only 2 people can also be reduced by 4 persons / times, fewer people on duty that this is particularly important to run power plants. Table 2 Open,uggs sale, shut down the date serial number of statistics on / off operation of the reasons 12003-04-21 stop 3FB automatic splitting machine changes to the outage (eliminating defects.) 220o3-04-24 and 220kV Ⅱ open 3FB home run power. 32003-05-08 stop 3FB automatically shut down the standby (cleaning). 42003-05-12 automatically shut down and I opened 3FB parent generation. 520o3-05-28 3F automatically stop running out to reserve units, 3B send down auxiliary power. 620o3-06 to open a Or7 3F and 220kVI home run power. 720o3-06-09 parked out to the unit 3F automatic backup solution, 3B send down auxiliary power. 820o3-06-10 to open the boot and 220kVI home run 3F. 92003-07-22 stop down manually 3F, 3B send down auxiliary power (034B installation cr). 1020o3 Or7-23 to open a boot and 220kVI home run 3F. l12003-09 automatic shutdown of a l1 stop 3F, 3B send down auxiliary power (for 035B cable tray overheating). 1220o3-09-12 On 3F of the plant shutdown automatically turned on and I home run. 132003-10-21 stop down manually 3F, 3B auxiliary power to send back (a small oil leak repair processing wheel.) 1420o3-10-23 to open the boot without pressure idling 3F manual (not strictly due to lower down the door.) 1520o3-10-23 stopped down manually backup 3F. 1620o3 a l1-05 to open the boot and 220kVI home run 3F. 1720o3 a l1-26 automatic shutdown stopped 3F, 3B send down auxiliary power (2 incidents tank drain.) 1820o3 a l1-30 to open the boot and 220kVI home run 3F. 1920o4-01-05 auto shutdown stop 3F, 3B send down auxiliary power (with 2F sand bottom intake and exhaust inlet check). 2020o4-01-08 to open the boot and 220kVI home run 3F. 2120o4-02-03 stop 3FB minor repairs. 242Oo4-02-16 to open the boot and 220kVI home run 3FB. 2520o4-02-22 auto shutdown stop 3F, 3B send down auxiliary power (with 2F trash rack replacement). 2620o4-02-23 to open the boot and 220kVI home run 3F. 272Oo4-04-12 to stop 3FB automatic splitting machines become outages. Mother with 220kV Ⅱ between 03 units and 33 units bus support insulator replacement. 282Oo4-04-14 to open the boot and 220kVI home run 3FB.
More articles related to topics:
ugg boots Gezhouba Second River Power Plant Monito
moncler jacken High pressure jet grouting technolo
mbt italia On the mean free path λ ^ -= 1 (√ 2 |
|